Jasa Konsultan Teknis untuk Pekerjaan Pengalihan Jalan Umum di Gurimbang
118,9 Ha Topographic Survey along the relocation road area. Geotechnical Surveys consists of 13 Points of Deep Boring, 14 Points of CPT and 48 Points of DCP included Soil Laboratory Tests. 2 locations of Traffic Counting Survey at road existing. Preparation of Basic Engineering Design Final Report, Basic Drawing and Basic Engineering Estimate.