Penyusunan Detail Engineering Design (DED) Proyek Jembatan Sungai Kuantan
Review of secondary data (topography and soil investigation report), Analysis and calculation of upper structure - substructure of the bridge and retaining wall, Preparation of bidding documents (BoQ, RAB, RKS, Plan Drawings).