Skid Resistance Test at Tanjung Bara Airport

  • Project Name

    Service of Skid Resistance Test at Tanjung Bara Airport

  • Client PT. Kaltim Prima Coal
  • Location East Kalimantan
  • Time Frame 2023
  • Scope of work

    Review of secondary data (Flight Frequency, The type of aircraft and the number of each type of aircraft in operation, Flight Operation Procedures, and Pavement History), skid resistance survey on the runway, and Preparation of reports based on survey results.

  • Tags: