Detailed Engineering Design (DED) of Suspension Bridge PMO-BMO

  • Project Name

    Pembangunan Suspension Bridge PMO-BMO

  • Client PT. Berau Coal Energy
  • Location East Kalimantan
  • Time Frame 2022 - 2023
  • Scope of work

    Secondary data review including topography data, bathymetry data, hydro- oceanography data, soil investigation result, and preliminary design of suspension bridge and material handling system. Field survey of 8 points deep boring at around river crossing. Detailed Engineering Design consists of structure, geotechnical, material handling system, MEP and pavement. Produce bidding document such as Bill of Quantity (BoQ), Engineering Estimate (EE), Technical Specifications, and Drawing Design.

  • Tags: