Civil Infrastructure Front-End Engineering Design (FEED) for Jailolo Exploration Drilling
Topography And Geotechnical Survey within project area such as Access Road, Well Pad, Basecamp & Laydown, Water Intake, Spoil Disposal and Drilling Water Supply. Geotechnical Surveys Consist Of 4 Points Of deep boring, 8 Points Of CPT, 9 Points Of DCP And 4 Points Of Hand Boring Included Soil Laboratory Tests. Project Main Deliverables is to Provide FEED Design Such as Well Pad, Drilling Water Supply from water intake to Well Pad Area, Geometric and Pavement Design New Road, Existing Bridge Assessment, Explosive Storage, Basecamp and Laydown Layout.