Jasa Konsultasi Perencanaan Overlay Runway 09 – 27 Bandara I Gusti Ngurah Rai - Bali
Secondary data inventory, Field survey (Topography Survey, PCI, Coredrill & Heavy Weight Deflectometer), Pavement structure analysis and its improvement, preparation of bidding documents (BoQ, RAB, RKS, Plan drawings).