Pekerjaan DED Overlay Runway Bandara Husein Sastranegara Bandung
Secondary data inventory, Field survey (topography, weakspot, coredrill and tespit), Pavement structure analysis and repair, Preparation of bidding documents (BoQ, RAB, RKS, plan drawings)